Lot of work done this week on plumbing, heating, and electrical. We met with the electrician on Tuesday to discuss changes to the plan. We added a couple outlets and fan boxes for ceiling fans in the bedrooms as well as switches to control the fan and lights. We added cable boxes in the office and bedrooms and loft area at the top of steps. We added recessed lighting in the kitchen, living room, and porch, as well as dimmers to control an number of lights. We had them stub off the wiring in the kitchen under where the counter tops are going to be so that we could add under cabinet lighting bars. We also had them run hdmi cables through the wall where the tv in the living room is going to be. In all I think that adding this stuff now instead of later is a good move but if you are planning on building and want to deviate from the plan it is definitely something that you should budget for. I took a ton of pictures of the walls with wiring and plumbing. It will be nice to have these someday if we ever plan on doing any work on the house. I'll actually know what is behind the walls.
from garage looking into kitchen
laundry room
Kitchen, notice recessed lights
kitchen sink area
3/4 bath rough in in basement
No comments:
Post a Comment