Today at lunch we stopped by the house to see if the cabinet and trim guys had gotten started yet. Half of the cabinets in the kitchen were up as well as the cabinets in the main and master bathrooms. I am hoping the kitchen is all setup by the time we get off of work. That would be awesome.
Refrigerator will be located in between the pantry cabinet and cabinets by the doorway. The cabinets by the doorway will be where we have our phone line installed and where we put down our keys when you walk in the door from the garage. All cabinets in the kitchen will get a molding around the top when they are done.
Corner cabinet hung up. The door for the corner cabinet is made of glass. Should look fancy but not quite schmancy. Nobody likes schmancy.
Main bath cabinets. There was an issues with the counter tops. The factory switched the main bath and master. Wayne homes got it all taken care of for us. Correct counters should be arriving this week.
Dark cabinets with a double sink for the master bath. No more fighting over the sink. I guess we will have to to think of something else to fight about.