It feels like slow going at this point but it is all stuff that needs to get done. Electrical outlets and light fixtures are almost all installed but for some reason I forgot to take pictures of them. I did take some pics of the bathroom sinks and counter tops. The counter top colors are still switched and the new ones haven't come in yet but for some reason they installed the sinks anyway. I talked to our field manager about it and he said it will be taken care of but I still don't get why plumbing it in and caulking it into place was the best choice when you know it is coming back out anyway. Oh well, as long as I don't get a bill and it doesn't hold us up from getting in this house I don't care.
Main bath on 2nd floor
Double Sinks, they cost extra but I did some calculations. $25 for a case of beer for me, $75 for a pair of shoes for my wife, and $50 for one dinner out to apologize. If this sink stops 4 fights from happening it will have paid for itself....I'm kidding....sort of.
Got a light fixture and a toilet. Can't tell if the toilet is small or it looks small because we got extra tall cabinets. I think it is a bit of both.
Main bath on 2nd floor.
Railing at top of steps. Looks darker than it really is. Totally love the color. Was thinking that we should have went with oak with white spindles until they actually stained it.
Loft area at the top of steps. We are going to put a couch and TV up here.
Baby's Room. Will be vacant until the end of May but we got a crib and some other furniture thanks to some of Jen's friends from work.
Bella's room. You can't see it but I think she has the biggest closet in the whole house.