Had a pretty successful day putting up fans at the house. My dad helped me put up the fans in the office and all 3 bedrooms. Right now we are waiting for the electric line trench to get inspected so that we can get the permanent electric line installed. Once that is done we can get the furnace running and our tile floors installed. Wayne homes will not start any flooring until the furnace is up and running from permanent electric and lights are installed. I wish we would have been giving a more obvious heads up before we got to this point but oh well. Till permanent electric is finished all progress is temporarily on hold. Water line was installed but when the water company went to turn it on they found a problem. A fitting at the meter box was backwards. K.L. Walters Excavating came right back out and fixed it in a day so that problem is taken care of. Our Appliances were supposed to be delivered this weekend but with all the delays we pushed it out till the third week of March. At this point we are hoping to be in by the last week of March. Today we are at day 126 of construction. Our "Dig Day" was on October 28 2013. I don't think our timing was perfect for this project being that is was completed over Christmas and New Years. I don't think the weather was very interested in cooperating this year either. Hopefully in a few weeks we can look back and laugh about it, but for now I think I might just curl up in a fetal position, cry myself to sleep, and wait till spring.....kidding.....sort of.
Office fan
Bella's bedroom, we have the same fan in the baby's room as well.
This is the fan we put in the master bedroom.



Looking great! You're almost done!
ReplyDelete