Monday, March 17, 2014

Carpet Installation in Progress

Stopped at the house at lunch and the carpet is being put in as I post this update.  After carpet there is truly only a few things left to do.  Some finish trim work, switching out the counter tops in the bathrooms, installing mirrors in bathrooms, installing powder room sinks, and testing the plumbing.  


This color carpet is through most of the house.  It is in the family room, office, loft, and two bedrooms.  The Master bedroom has a light gray carpet.


Office carpet being installed with padding visible.

No comments:

Post a Comment