Tile floors are done. I am really pleased with the color selections that we made for the tile. I think that all the flooring, cabinets, and paint colors are going to look nice together. I think they are going to start doing the carpet next week and finish up the trim work. We are almost done.
This picture is taken standing at the front door looking down the hallway to the dinette area that sits between the family room and the kitchen. The door on the left is to the powder room. On the right you can see we are missing a couple rungs on our railing. The trim guys should be finishing this next week. The steps will be carpeted next week as well.
This photo is taken looking down from the second floor into the foyer.
Kitchen sans appliances. They will be delivered on March 22nd.
Looking from the Dinette to the foyer.
Kitchen. I need to get a wooden outlet cover for on the island and stain it to match the cabinets. The white one sticks out like a sore thumb.
The counter tops are actually darker than they look in these pictures. There is a layer of dust from the construction process that is laying on top of them.
Main bath. No Mirrors put up yet. Counter top still needs switched out for the right color. The tile looks darn good though.
Tile in master bath. We pushed the one wall back two feet to make our closet bigger. When we did this it made our bathroom larger as well. We could have a party in this darn thing.
No mirror yet, Counter top still needs switched, but again, I think the tile color is gonna look great.
Tub and closet in master bath.